40 Bar Injection Grout Pump

40 Bar Injection Grout Pump

Software:
·         Grouting single slurry in tunnels, slope, mines, bridge and all sorts of underground engineering and many others.
·         Repairing engineering with grouting.
Characteristics:
·         Single piston double-acting
·         Gear&vee belt transmission tends to make this pump high mechanical effectiveness and doing work
·         dependability
·         Integrated valve house and ball valve, collectively with compact framework
Body of pump is made of aluminum casting,minimal excess weight is an benefit for transportation

CZPT knowledge:
 

Product RG130-20 RG60-40
Operate elements one cylinder double motion. spherical valve reversing single cylinder double motion. spherical valve reversing
Output one hundred thirty L/min sixty L/min
Strain 2 Mpa(20bar/290psi) four Mpa(40bar/580psi)
Cylinder Dia φ75 mm φ75 mm
Piston stroke 85 mm eighty five mm
Piston Speed 180 /min 85 /min
Inlet diameter 51 mm 38 mm
Outlet diameter 38 mm 32 mm
Electricity unit 5.5 kW(CZPTtric) 10hp(Diesel) five.5 kW(CZPTtric) 10hp(Diesel)
Transmission V-belts +gear circumstance V-belts +equipment circumstance
Chassis Skid Skid
Weight 260 kg 210 kg
Dimensions 1400×650×920 mm 1280×485×645 mm
Notice:One or Double Passageway.Skid or Tyre

 

FAQ:

one. Q: Which design must we select?

A: We have several models for your choice. Just before suitable model is advisable, make sure you tell us the application, components, output and pressure you want.

two. Q: Can we have CZPT model?

A: Sure. We can make the CZPT machine in accordance to your actual needs.

three. Q: Do I want to know technological expertise to run this equipment?

A: No. This device has no expert needs for the operator. Nevertheless, we offer technical instruction for your backup.

four.Q: What should we do if there are some difficulties with the equipment?

A: You can refers to the Work Instruction or speak to us for online instruction. Also, our engineers are obtainable to provider abroad.

5.Q: What is the lead time? 

A: 1 week for sample design, two~three months for CZPT product. It depends for mass generation.

6.Q: How about the package? 

A: We have fumigation-totally free wooden case to protect the equipment from damage during the prolonged-length shipping.

seven.Q :How should I pay for you if I place this get? 

A: CZPTly, TT, thirty% deposit 70% prior to shipment.

40 Bar Injection Grout Pump

Tags: