Construction Equipment BS30 Mini Concrete Pump with Drum Mixer

Construction Equipment BS30 Mini Concrete Pump with Drum Mixer

      CZPT CZPT BS30 Mini Concrete Pump with Drum Mixer
Oil pump is pushed by diesel engine and produce hydraulic pressure, utilizing the hydraulic pressure driving oil cylinder for reciprocating motion, the concrete piston suction or shipping motion
The major complex parameters

Things
 
Units
 
Parameters
 
BS30-ten-56R
 
Complete efficiency of device Max. theo. concrete output (L./H.)
 
m3/h thirty/18
Max.concrete pumping stress (H. /L.)
 
MPa ten/6
Distribution valve variety
 
  S
S Valve
Concrete cylinder diameter×stroke
 
mm Ф140×1000
Hopper capacity×feeding peak
 
L×mm 400×1300
Outlet diameter
 
mm Ф100
Electricity system Diesel motor product
 
           Commins
CZPTtrical engineering electrical power
 
kW fifty six
Rotate speed
 
r/min 1500
CZPT system Circuit variety
 
  Open up circuit
 
Pumping system stress
 
MPa 24
Mixing technique force
 
MPa six
Capability of oil tank
 
L a hundred and seventy
  The most significant transportation is away from vertically (/Level) m         140/400
Other parameters     Max. mixture diameter
 
mm Scree:30/ 25/twenty
Inside diameter of offering pipe
 
mm Ф100/80/65
Dimensions:length×width×height
 
mm 4300×2100×2260
Total weight  kg 3500

The use demands and issues needing consideration are briefly launched as follows:
one) Just before utilizing the equipment, verify the situation of motor oil and coolant, to ensure no shortage of oil and coolant in the method of making use of.
two) operate time note: when begin the diesel engine, if it has not commenced inside of fifteen s, you need to repeat it  after 2 minuts.Diesel engine ought to be idle operating 2-3 min soon after beginning, then be typical operate.,and oil pressure need to be higher than 120 kpa in that time.
3) packing be aware: normal parking, firstly discharge load , then lessen the oil to the idle speed, and working a few minutes ahead of shut down
four) typical inspection and routine maintenance:
a) employing 250 several hours to clear up the air filter cartridge
b) making use of 250 hrs to change oil and oil filter
c) using five hundred several hours to replace diesel oil filter
Welcome to pay a visit to and inspection our business.
Your satisfaction is our pursuit.
If you need to have far more particulars info,kindly get in touch with us now:

Supervisor title : Truseen
HangZhou TRUSEEN CZPT CO,.LTD
Tel: -371-86238892    Mobile mobile phone:15617732826
Include:HangZhou High-tech CZPT CZPT Zone,ZheJiang CZPT,P.R.China
 

 

Construction Equipment BS30 Mini Concrete Pump with Drum Mixer

Tags: