High Pressure Pneumatic Pump for Gas Liquid Pressure Booster Station

High Pressure Pneumatic Pump for Gas Liquid Pressure Booster Station

CZPT Parameter of CZPT
 

Gas Booster Technique
Task parameter
Take a look at medium three.5MPa nitrogen or argon
CZPTn force 3-8Bar
Maximum output pressure 80MPa
Medium temperature Regular temperature
Ambient temperature Regular temperature
Handle loop 1 way handle loop
management technique Guide procedure

Solution Description

We can generate a variety of pneumo-hydraulic pressurization methods in accordance to customers’ needs. These programs can be employed for force tensioning, hydraulic push and handle, hydraulic check, and so on. The greatest stress can be up to 6400bar.
CZPT Pneumo-hydraulic Pressurization System has compact structure and is effortless to run. What the users require to do is only to guide the push air to the liquid port, then alter the force regulating valve of the generate circuit to achieve the required doing work force. 

Common gas pressurization operation

Standard applications:

1.  Static and burst examination for valves, pipe fittings, and so forth.
two.  Test for automobile brake method and nozzles.
3.  CZPT reagent injection into pipelines or response kettles.
4. Putting coolant into jars.
5.  Providing drive for clamping, forming, drilling, shearing and stamping devices.
6. Offering buffer and lift force to safeguard molds when massive presses overload.
7. Static and dynamic test for aviation components.
8. Overall performance examination and calibration for instruments.
9. Substantial force cleaning and h2o injection of waterjet reducing equipment.
10. Injecting oil into lubrication system of mechanical equipment.
11. Offering clamping pressure for valve examination.
12. Providing push force for shaft sleeve and cylinder liner.
13. Controlling ground and underground basic safety valves.

Our manufacturing unit

FAQ

one. Delivery CZPT: FOB HangZhou, by vessel
two. Supply Time: fifteen-twenty times
three. Payment CZPTs: T/T (one hundred% to shell out by T/T )
four. Installation / Procedure / Provider / Handbook: In English
five. Guarantee: One 12 months from the date of completion of the commissioning.
6. Pre-shipment Inspection: Provider ought to demo operate entire line at supplier’s manufacturing unit just before shipment.

About shipping

Fumigation wooden cases, which are nicely sealed and sturdy adequate for lengthy-term journey, and ideal for multi-instances loading & unloading by forklift.

 

High Pressure Pneumatic Pump for Gas Liquid Pressure Booster Station

Tags: