Save Labour Concrete Trailer Pump Hydraulic Concrete Pump

Save Labour Concrete Trailer Pump Hydraulic Concrete Pump

Product Description
 

Concrete trailer pump is a set of mechanical, electrical and hydraulic technological innovation as a single, with dependable overall performance of sleek procedure and robust pumping capacity. Trustworthiness and balance is confirmed by automatic motor regulation.

one) Convey flooring heating lightweight foamed cement, mortar, wonderful aggregate concrete.
2) Convey all sorts of engineering development in the simple concrete, fiber concrete.
three) Conveying or injection of refractory and thermal insulation substance
four).Conveying or jet of greening soil on the design of ecological environment 
five). Conveying or injection of basic concrete and fiber concrete for all kinds of engineering design.

 

    Specification                                          Design
CPM-15
Max Conveying Ability 10-12m³/H
Max Exit Stress ten-15Mpa
Max Aggregate Size one-2cm  
Bore diameter*diameter  Φ120*360mm
Pipe Diameter  Φ63/80/100mm
Motor Power 15KW
Dimensions 1550*750*1200mm
Host Excess weight 580KG
Horizontal Max Theoretical Transportation Length 60m
Vertical Max Theoretical Conveying Distance 20m

 

Software

 

CZPT & CZPT

 

 Package: Packed by picket scenario.

 Shipment: By sea, LCL or FCL.

 

Our Providers

 1. We will offer the right after- service help for all the customers

2. If the consumer demands, we will assign the engineers to provide specialized help on site.

three. Implement the first obligation method with heat reception, and  should answer all questions.

4. Provide technical session on content selection and use, and stick to up on internet site as essential.

5. The supply precision of the products is a hundred%, and the goods code, bill and warranty are processed in accordance to the specifications of the clients and well timed shipped to the consumers.

six. Follow up user’s merchandise utilization, supply specialized assist and training in time.

FAQ

Q: Are you trading firm or maker ?

A: We are producer. Our manufacturing facility address is Xihu (West Lake) Dis. industrial concentration district, HangZhou metropolis, ZheJiang province, China.

Q: How lengthy is your supply time?

A: CZPTly it is 7 days if the products are in stock,or it is in accordance to quantity.

Q: What is your phrases of payment ?

A: Payment=3000USD, thirty% T/T in advance ,stability ahead of shipment.

Q: Can you provide set up services?

A: We can provide set up support , but you need to have pay out for the air tickets, hotel,meals and 50 USD/ working day.

 

If you have any query , remember to contact me.

 

 

 

 

 

 

Save Labour Concrete Trailer Pump Hydraulic Concrete Pump